SANJOSE will build the first stretch of the future Highway A-57 of Pontevedra for EUR 59.46 million
20/07/2015
The Ministry of Development has awarded SANJOSE Constructora the execution works of the stretch Vilaboa - A Ermida for Eur 59.46 million and an execution period of 37 months. The project covers the execution of the stretch Vilaboa - A Ermida of 6.48 km. and a bidirectional link connecting with the N-550 1.74 km long.
This stretch of 6.48 km. in length will be the first of the future highway A-57, which will be the alternative infrastructure to the road N-550 in Pontevedra. This project will run along the east of the metropolitan area of the city of Pontevedra, touring the City Halls of Pontevedra and Vilaboa, and crossing the municipalities of A Ermida, Pintos, Valladares, Pumariño, Bértola, O Outeiro and Boullosa.
The new highway will consist of two lanes (one for each direction), separated by a 3 m. wide median. Both roads will consist of two lanes 3.5 m. wide each, an inner shoulder of 1.50 m., a 2.5 m outside shoulder and 1.10 m and 0.60 m. wide berms. for the exterior and the interior, respectively.
Further, for the connection of this new infrastructure with the existing N-550 a bidirectional link of 1.74 km. starting at Vilaboa will be executed, and after crossing the railway line Pontevedra-Redondela and the AVE line "Atlantic Axis", it will connect with the N-550, proceeding to the remodelling of the existing link in this area to the AP-9.
Among the works to be implemented the project includes 3 links (A Ermida - PO-532, Vilaboa - A-57 and the aforementioned A Ermida - N-550), 4 viaducts, five overpasses and 2 underpasses.